It was no less than 460,000 euros -end “luxury report”, as the “Kroon” revealed, which in 2021 had “delayed” the construction of the loftunnel. Brisant: As the Ministry of Transport confirms, the construction of the tunnel confirms previously evaluated internet before the order for the expensive report – but with a completely different result.
Hardly a traffic project once caused so many discussions in Austria as the construction of the loftunnel. The project has been a subject since 1993 and in 2002 the construction of the S1 was included in the Federal Roads Act. Since then, the dimension of the project has changed several times and the start of the project has been delayed. The former Minister of Transport of De Groenen, Leonore Gewessler, also served as a basis for this, also a luxury report unveiled by the “Krone”. The evaluation cost no less than 460,000 euros.
Source: Krone

I am Ida Scott, a journalist and content author with a passion for uncovering the truth. I have been writing professionally for Today Times Live since 2020 and specialize in political news. My career began when I was just 17; I had already developed a knack for research and an eye for detail which made me stand out from my peers.