Match preview: Valladolid B receives Marino Luanco

Date:

Next Sunday at 12:00 the match will be held on the sixth day of the Second Federation, where Valladolid and Marino Luanco will face each other at the Jose Zorrilla Annexes.

Valladolid B arrives with hopes of achieving victory in its next match in the Second Federation after losing its last match against Rayo Cantabria with a score of 4-0. Since the start of the competition, the locals have won one of the five games played so far, with a streak of five goals in favor and 10 against.

For its part, Marino Luanco experienced a defeat against Gimnástica Torrelavega in the last match (0-1), so came to the match with the need to return to victory in the field of Valladolid B. Before this match, Marino Luanco have won zero in five games played in the Second Federation this season, with a balance of one goal scored against three conceded.

In reference to the results at home, Valladolid B achieved the statistics of one loss and one draw in the two games played in its stadium, giving more opportunities than expected to the visitors, who could have an easier win . Away from home, Marino Luanco has a record of one defeat and one draw in the two games played, figures that do not reflect an overly optimistic balance for the match that will measure them against Valladolid B.

In their last confrontations between them at the Jose Zorrilla Annexes, the numbers show victory in favor of Valladolid B. At the same time, the streak of the locals is remarkable, as they have won three consecutive games at home against Marino Luanco. The last time Valladolid and Marino Luanco played in this tournament was in April 2023 and they ended 0-0.

Currently, the two teams are separated in the standings by one point in favor of Valladolid B. Currently, Valladolid B has four points and is in fifteenth position. As for rival Marino Luanco, they are in sixteenth position with three points.

Source: La Verdad

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

Pensions, subsidies – Austrians for reforms – also with themselves

Chamber of Commerce President Harald Mahrer calls for reforms...

They are planning to finish the new Vorroria train station in 2030 and later the underground will be tackled

There are no concrete data for underground, although it...