Hybrid trains will arrive later in Valle de Carranza after the controversy with Cantabria and Asturias

Date:

The request from both communities to the CAF company included a series of hybrid trains for the Bilbao-Santander line. They come, like the rest, two or three years later.

Euskaraz irakurri: Karrantzak behar dituen tren hibridoek beranduago helduko dira Kantabriako et Asturiasko aferaren ondorioz

He train affair by Cantabria and Asturias It has consequences in Euskadi. The hybrid trains that Valle de Carranza (Bizkaia) must connect Santander and Bilbao they were in the same demand as said trains. They are already two years late and due to the design flaw they arrive even later. The Valle de Carranza line is outdated and technical problems are common.

The request from both communities to the CAF company included a series of hybrid trains for the Bilbao-Santander line. They come, like the rest, two or three years later. This has a direct impact on Valle de Carranza, where for years they have denounced the lack of trains, drivers and maintenance.

As they explain from the local platform, half of the trains running through the city are at least an hour late, and the situation has worsened over the years. In 2002, the journey from Carranza to Bilbao took an hour, and two decades later, traveling the same route takes an hour and 20 minutes.

(function(d, s, id) {
var js, fjs = d.getElementsByTagName(s)[0];
if (d.getElementById(id)) return;
js = d.createElement(s); js.id = id;
js.src = “//connect.facebook.net/es_ES/sdk.js#xfbml=1&version=v2.8”;
fjs.parentNode.insertBefore(js, fjs);
}(document, ‘script’, ‘facebook-jssdk’));

Source: EITB

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related