The United States imposes a rate of 28 % on the wind towers of Siemens Gamesa and Windar

Date:

The decision includes a reduction with regard to the 73 % of 73 % established in 2021 and against which Siemens Gamesa claimed.

He International Trade Court of the United States (CIT) has determined to impose a rate of 28.5 % on the export of wind towers made in the Spanish state by Siemens Gamesa Renewable Energy (SGRE)as before Windar Renewables (Windar) and several of his subsidiaries.

The decision, taken over the past January 28 And that will be published on Tuesday in the federal register, the BOE of the North -American country, is a reduction with regard to the margin ‘anti -dumping’ of the 73 % Founded for the time being in 2021 and against which Siemens Gamesa claimed.

In that sense, Siemens Gamesa challenged the provisional decision that claimed that the allocation by the Ministry of Commerce of The rate of 73 % “was illegal”.

Although in a first provision he maintained his provisional decision to determine a margin of estimated average weighted dumping of 73 %, he concluded in a second provision that the average weighted dumping of the average was weighted 28.55 %.

Source: EITB

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

Israel starts his new large -scale land offensive in Gaza with the ‘Gideon Cars’ operation

This new offensive takes place after the Gazati authorities...

Seriously wounded -Berlin: 28 -year -old police officer Stoke in the throat

On Friday evening there was a dangerous argument between...

Brutal deed furious – Thieves Steel 33 (!) Beer tens sets

There is currently enormous indignation among the volunteers of...

Man (23) had thirsty – steering wheel while police control bottle of wine

After a 23-year-old car races from Lochen (Upper Austria)...