Finally the shield will shine in Anoeta

Date:

The view offered by the new Anoeta Stadium is spectacular, especially on game days at night, when it is dazzled by the blue light reflected by its coating. It conveys the feeling that something big is going to happen inside that coliseum. But two elements have been missing since the remodeling: dynamic exterior lights and, above all, Real’s shield, for many of its fans the most beautiful in all of football. But that is in the process of being fixed. It is hard to see, but it will come true.

As MD learned, Real planned to place a large shield, his with a ball crown, on the outside of Anoeta, but not in front. It will be a large sculpture that will be placed next to the stadium on the esplanade where the mole station is located, so that it can be seen from Avenida de Madrid. We have to wait to see what the expected visual effect is because this shield in the form of a sculpture will not be installed until all the exteriors of the Amara Coliseum are urbanized. And that won’t happen until the reform of the Miniestadio. When this is over, the rehabilitation of Anoeta, whose exterior is still half finished, will finally be completed.

True fans will remember that the Real shield hangs in front of the old Anoeta, on the side facing Avenida de Madrid and the Center, but next to Gipuzkoa and Donostia. The three of them are small. Many followers requested, without result, the installation of the logo in the center, larger and without accompaniment. In the current ETFE cladding of the Anoeta there is only one element that interrupts the blue aesthetics of the panels: the illuminated sign with the sponsor’s label: Reale Arena.

the third statue

Outside the stadium two monoliths are currently rising: the bust dedicated to Alberto Ormaetxeawhich is located on the front side and the one that is enlarged in memory of Aitor Zabaletawhich is located on the other side, opposite the access to the Txuri Urdin Ice Palace.

Closer to the time is the installation of the so-called digital ring, present only in the Metropolitan in the League to date. This so-called ‘Ribbon Board’ will be placed inside between the two stands, it will replace the static advertising panel that currently exists and will display the dynamic advertisements and messages that the Royal wants to convey. As reported by DV, it will be more than 500 meters long, will be made up of panels equipped with LED lights and will be unveiled during the next match against Osasuna on December 31.

Source: La Verdad

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related