The works of Spotify Camp Nou They continued their course and finished the process of dismantling the third grade. The third ring was completely removed and is now one of the defining points of the entire operation. The construction of the third tier as well as VIP rings. This will require the installation of several large cranes capable of moving the precast concrete blocks that will allow the construction of what will be Barça’s new home.
The current look, as seen in the photos shared by FC Barcelonais a two-tier stadium that contrasts with the grandeur and grandeur of the old Camp Nou, which is now gone and part of history.
According to forecasts by FC Barcelona and those responsible for the works, the idea is that in November 2024 matches can be played in the culé fiefdom, by which time the first two stands and the surrounding facilities will have been completed such as the Museum or the Pharmacy.
It is worth remembering that in a recent interview with MD, the economic vice president of FC Barcelona, Eduardo Romeoassured that “we are ‘on time’ with the works” and added that “we have no delays in the stadium renovation deadlines.”
Source: La Verdad

I am Shawn Partain, a journalist and content creator working for the Today Times Live. I specialize in sports journalism, writing articles that cover major sporting events and news stories. With a passion for storytelling and an eye for detail, I strive to be accurate and insightful in my work.