The Basque government opens the procedure for a new wind farm in Vitoria and Elburg

Date:

The Basque government presented the project by Prime Minister ESPF IPAZ Haizeea 11 Company, consisting of two wind turbines; The same company has asked to give permission for the construction of another wind farm with seven generators in Arrazua, Elburg and Vitoria.

The Basque government has selected the project that is presented by Premier ESPF IPAZ Hize 11 Company for installation A small wind farm in the municipal conditions of Vitoria and Elburg.

The official Gazette of the Basque Country (BOPV) publishes on Monday the resolution of the Ministry of Industry, Energy Transition and Sustainability in which this project is chosen in the competence and a period of six months is opened for the promoter to present the documentation for the processing of previous administrative authorization.

The project consists of Two wind turbines With a gross power installed 9.98 MW in a wind farm called ‘PE cluster Ali I-II’.

This same company has requested permission for the construction of Another wind farm with seven generatorsWith a force of 34.93 MW, in the Alava conditions of Arrazua, Elburg and Vitoria.

Source: EITB

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related